Aluminum formwork is a popular choice in construction.
What is aluminium formwork system - 2025
Aluminium formwork is a new generation of construction formwork system after timber and steel formwork. Aluminium alloy profile is the main material and it is made into formwork through machining, welding, and other processes, which is suitable for concrete engineering,Super high-rise buildings, basements, residential buildings, utility tunnels, etc.
Aluminium formwork can be assembled freely according to different structures and sizes. Its design and application is the innovation of formwork technology.
Types of Geto formwork system
As an experienced aluminum formwork manufacturer, Geto has a very rich and complete formwork product system:
By material:
Timber Formwork
Steel Formwork
Plastic Formwork
Tunnel Formwork System
Steel-Framed Timber Formwork
By application scenario:
By function:
PPVC Precast Housing Molds
Quick-Deck System
Single-Side Wall Framework
Table Formwork
Aluminium Formwork For Basement
Shaft Steel Formwork System
And, the global market demand for efficient building solutions is growing.....
Source: https://exactitudeconsultancy.com/reports/48369/formwork-panels-market
Advantages of aluminium formwork
Excellent forming effect
Aluminium formwork uses large, single-piece formwork to minimise joints and ensure an even surface finish. Its high precision ensures accurate alignment and structural integrity. Its high load-bearing capacity means the system remains stable under the weight of wet concrete and, crucially, it produces a high-quality concrete surface that meets clear water standards, without the need for plastering.
Less construction cost
Compared with other formworks, aluminum formworks are more cost-effective. The reason is its high utilization rate. The faster and more convenient installation process saves high labor costs, and it can also minimize the rental costs of heavy equipment such as cranes. In terms of surface treatment, it saves plastering and decoration costs. After the construction is completed, it can also be recycled.
Increase construction speed
Since the aluminium formwork is light in weight, workers can carry and assemble it without any equipment. The assembly process is as simple and flexible as building blocks.
Aluminum is tougher and more solid after assembly
Aluminum is a material with high strength, strong bearing capacity and is not easy to deform. The overall frame formed after the system is assembled is highly stable. During the assembly process, there is no need to call a crane or perform dangerous high-altitude operations, which greatly reduces the chance of falling accidents.
Aluminium formwork can be recycled many times
The service life of aluminum formwork can reach an astonishing 200-300 times. Waste aluminum formwork can basically be recycled, which can reduce the generation of construction waste to a certain extent and save costs
Conventional formwork vs aluminium formwork.
Characteristics |
Steel Formwork |
Timber Formwork |
Aluminium Formwork |
Material Performance |
|||
Average weight |
35-85kg/m² |
10.5kg/m² |
25-27kg/m² |
Loading capacity |
30-60kN/m² |
30kN/m² |
60kN/m² |
Tensile strength |
≥370MPa |
≥120MPa |
≥260MPa |
Characteristics of Installation Process |
|||
Installation difficulty |
Low |
High |
Lowest |
Labour intensity |
High |
High |
Low |
Security risk |
High |
High |
Low |
Depend on lifting machinery or not |
Need |
Need |
Needless |
Concrete Forming Effect |
|||
Concrete surface quality |
Rough,clean |
Rough |
Glossy,smooth |
Need to plaster or not |
Needless |
Need |
Needless |
Precision |
High |
Low |
High |
Comparison of Cost |
|||
Amortization cost |
High |
High |
Low |
Scrap value |
Middle |
None |
None |
Environmental Protection |
|||
Environmentally friendly |
Yes |
No |
Yes |
Generate construction waste or not |
None |
Much |
None |
Common formwork |
30-40 times |
3-5 times |
150-300 times |
Efficiency |
|||
Efficiency |
8-10 days/Floor |
10-12 days/Floor |
4-6 days/Floor |
*The data above are from GETO's construction experience. |
The difference between geto aluminum formwork and its peers
Geto aluminum formwork includes a tie-rod system
By using GETO's tie rod reinforcement system, the building's molding effect will be smoother. It is suitable for renovation projects of different structures and structural projects with wall thickness greater than 400mm.
And an efficient flat-tie system
The template with flat tie system not only does not need drilling, but also has better vertical pouring effect.
In particular, the simplification of installation accessories greatly reduces the installation workload and complexity of workers, which is more in line with the usage habits of overseas workers.
Related articles:Aluminium Formwork System Overview: Types and Major Components
How Geto aluminium formwork works? Let’s watch the video.
Geto offers global customization solutions for aluminum formwork systems.
Combination of formwork systems - Skyscrapers use aluminum formwork and self-climbing platforms
By providing an integrated design of the aluminum formwork system and the self-climbing platform system, we are able to provide an effective solution to improve the efficiency of the structural engineering progress of super-tall skyscrapers. In this case, GETO customized the design of multiple connection points between the aluminum formwork system and the self-climbing platform system, for example, we will provide additional reinforcement accessories and steel frame structures.
Geto successful projects display.
Our cooperation scope covers six continents, namely Asia, Europe, North America, South America, Africa and Oceania, and more than 50 countries and regions, including 35 countries along the "Belt and Road", and has successfully completed more than 400 high-quality overseas projects!
Projects in asia and middle east